• product up1

Products

Factory Supply Swr Pipe Mould - UPVC Yee Tee Pipe Fitting Mould – Longxin

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We keep on with the theory of "quality first, provider initially, constant improvement and innovation to meet the customers" with the management and "zero defect, zero complaints" as the standard objective. To great our company, we deliver the merchandise using the fantastic excellent at the reasonable price for Upvc Fittings Mould, Fusion Ppr Pipes Fittings Mould, 110mm Upvc Pipe Mould, We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
Factory Supply Swr Pipe Mould - UPVC Yee Tee Pipe Fitting Mould – Longxin Detail:

Quick Details

Origin: Taizhou, Zhejiang, China

Brand: UPVC mould

Model:UPVC Yee Tee Pipe Fitting Mould

Moulding mode: plastic injection mould

Product material: Steel

Products: household goods

Name: China high quality plastic UPVC Yee Tee Pipe Fitting Mould

Cavity: 2 cavities

Design: 3D or 2D

Runner type: cold runner

Die steel: p20h / 718 / 2316 / 2738, etc

Mould base: LKM, HASCO, DME

Mould life: 500000

Sampling time: 60-90 days

Colors: all colors

UPVC Yee Tee Pipe Fitting Mould

The main Mould Steel and Hardness for you reference:
Steel Grade S50C P20 P20HH 718H 2738H H13 S136 NAK80
Hardness(HRC) 17-22 27-30 33-37 33-38 36-40 45-52 48~52 34-40

Pipe Fitting Mould Features :High Automation multi cavities ,high precision,high productivity, long-lasting lifeWe have our own unique design for some moulds,

Our services

We longxin adhering to the principle of quality first, service first to serve each of our customers, professional production of PVC Sewage Or Y Tee Pipe Fitting Mould, Welcome to call and order

1. In-time response on letters, telephone calls or fax

2. In-time supply the quotation and mould designs

3. In-time sending pictures for the mould machining progress and mould finishing schedule

4. In-time sending pictures for the mould machining progress and mould finishing schedule

5. In-time mould delivery.

For more information please contact us.

Packing and delivery

How to pack PVC  Tee Pipe Fitting Mould flaring in wooden case:

First  : Daub rust preventive oil on the mould.

Second : We pack the mold with thin plastic film to avoid moisture.

Third : We put this plastic film packed mould in a wooden box, and fix it avoid any movement.

Packing size of wooden case: according to mould size

Port:Ningbo

UPVC Yee Tee Pipe Fitting Mould
Package delivery

FAQ:

Finally, a pair of pipe fitting molds have been made. Next, we have to test the effectiveness of the mold, that is, mold trial. Then put it into production, and how to maintain the mold during production, so that the mold can be in a better working condition and let us reap the greatest benefits?

Below we will introduce the things that we should pay attention to when trying out our pipe fitting molds for this UPVC Yee Tee pipe fitting molds:

1. Whether the mold opening and closing is smooth, and whether the ejection is smooth.

2. Pay attention to the position of the mold gate and the way of glue feeding, the size of the gate and the size of the cavity, and select the appropriate pressure, speed, and material volume for injection molding. 3. After the mold heats up, carefully check whether all the matching parts of the mold are too hard, and then confirm the bonding line and exhaust. After the product is full, ask the quality personnel to confirm the size and appearance.

4. During the mold production process, check the mold settings and safety devices to let the operating staff understand the possible problems in the process. After the production is completed, the lower mold or standby needs to take necessary measures for the machine and mold.

5.When the mold is not in production, the pipe fitting mold should be maintained. First check the mold and determine the maintenance method. If you need to disassemble the parts, first check whether there is a clear mark. After the maintenance of the parts is completed, the assembly should be matched and seated. After the assembly is completed, first confirm the sequence of the mold. Pay attention to the careful inspection and confirmation of the first piece after each maintenance, and the production can be continued after the quality personnel confirm OK.


Product detail pictures:

Factory Supply Swr Pipe Mould - UPVC Yee Tee Pipe Fitting Mould –  Longxin detail pictures

Factory Supply Swr Pipe Mould - UPVC Yee Tee Pipe Fitting Mould –  Longxin detail pictures

Factory Supply Swr Pipe Mould - UPVC Yee Tee Pipe Fitting Mould –  Longxin detail pictures


Related Product Guide:

Our well-equipped facilities and great good quality regulate throughout all stages of manufacturing enables us to guarantee total buyer gratification for Factory Supply Swr Pipe Mould - UPVC Yee Tee Pipe Fitting Mould – Longxin , The product will supply to all over the world, such as: Paris, Ghana, Los Angeles, Being guided by customer demands, aiming at improving the efficiency and quality of customer service, we constantly improve products and provide more comprehensive services. We sincerely welcome friends to negotiate business and start cooperation with us. We hope to join hands with friends in different industries to create a brilliant future.
  • We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By Doris from Germany - 2017.02.14 13:19
    This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
    5 Stars By April from Luxemburg - 2018.11.22 12:28
    Write your message here and send it to us